Tuesday, April 5, 2011

Week 21: Bathroom

This weekend, Stephen had to reframe the window for the bathroom, because the old church window we bought turned out not to be the size reported by the guy we bought it from on Craigslist. It's actually about 5' x 5'. It takes up almost the whole wall. We put in drywall in the bathroom. Stephen finished out the electrical in the bathroom and hired to have the major electrical cable hooked up to the pole.

No comments:

Post a Comment