Stephen got in the stove on Thursday. One of the ovens needs a screw to shut all of the way, but otherwise, it's awesome. Everything works. Notice in the photo that I put the microwave under the washtub - I've had enough microwave for a long, long time.
Tuesday, November 20, 2012
Friday, November 16, 2012
3rd Week November, Wood Stove
I tiled the stove pad over vacation before we put in the wood floor. Then Stephen made some trim for around the tile a couple of weeks later. I cut the trim with the miter saw and installed it, then taped it up and grouted the marble tiles. Why doesn't a miter saw ever cut angles precisely? After I took off the tape and sanded, I carefully stained and polyurethaned the trim with a little brush. Then I sealed the tiles and we moved the stove onto the pad. We had the stove pipe professionally installed last Thursday, and we used it on Tuesday.
3rd Week November, Kitchen
Monday, October 15, 2012
2nd Week of October, 2012
Fence on right and left |
As the fence did not get finished either over the vacation or the weekend after, I stretched the last 1/3 of the welded wire myself. Used some straps and a come-along. Why is it that all outside tools are made for strong people with calloused hands? Then this weekend I made a picket gate and hung it all by myself. Amazing.
Monday, October 8, 2012
2012 Vacation
In three weeks of Stephen's vacation, we painted the interior of the apartment, put in oak floors, and started the dog fence. I usually do all of our painting, but we used a paint gun this time, and I don't know how to do that very well.
Wednesday, May 2, 2012
2012 Update
My last post was at the end of June, 2011. At the beginning of July, we put the house we were living in up for sale, and I sold it the next day. That's right. One day.
Subscribe to: