Monday, December 6, 2010

Week 16: Trim Saga Finale


Stephen put up misc. trim, roofing and flashing to get us ready for siding next week. We still couldn't get the boom lift to do the gable trim, so it will have to be done at the same time as the top gable siding.

Much of the weekend was spent trying to locate siding and discussing options.

I primed half of the rafters that will remain exposed in the apartment.

Wednesday, December 1, 2010

Week 15: Thanksgiving

For the four day weekend, we had planned to get a boom lift to get into the gables to put up trim, but they didn't have any available. Instead, we put up the eyebrows, primed and tar-papered them, and Stephen trimmed out the cornices and soffits on the non-gabled sides of the house. The soffits are a foot deep, and the trim extends a foot below the soffit. The trim detail (dentil blocks, etc) will be added later. Stephen also added a pediment hood over the apartment door entrance.

We got the door hardware for the apartment entry from Ebay this week, some cool old handmade wrought iron stuff.

The trim has taken much longer than expected, and it's getting cold here. It looks like we'll be finishing the exterior about four weeks behind schedule.

Week 14: Door Trim and Eyebrows

On week 14, Stephen built the door trim, including the doorways that don't yet have doors. He finished up the cornice returns.

He also built the half-elliptical hoods for the carriage doors (eyebrows.) I built none, but designed both the look and the construction method. Two arches were cut out of plywood for each set of carriage doors, then the plywoods were connected by pieces of 2"X6" and covered on the top with OSB with kerfs cut into the top to allow it to bend. They will eventually be covered with copper.

Monday, November 15, 2010

Week 13: Window Trim


Later picture shows window trim and cornice returns
Stephen trimmed out the windows with 2"X6" and 2"X4" treated pine. He had considered cedar, but decided against it because the chance of getting long enough pieces in excellent condition was unlikely at best, and cost prohibitive at worst. This means we will not be able to paint the trim until next year.

Week Twelve: Windows and Cornice Returns

We finished putting in the windows on week twelve. Stephen also built cornice returns on the gable ends, so that the cornice trim will wrap slightly on the ends.

Wednesday, November 3, 2010

Week Eleven: House Wrap

This week, we put house wrap over the sheathing. Stephen took off Monday so we'd have some extra time.

Week Ten: Sheathing


The roofers came Monday after week nine, and charged us an extra $600 becuase we forgot to tell them the roof was on the second story.